Are you considering the installation of your own power generation, like solar?

Distributed generation (DG) is power generation that is defined as small generation units distributed around Flint Energies’ distribution system. DG systems can be powered by solar, wind, landfill gas, diesel fueled engines, natural gas fueled micro-turbines, etc. DG refers to electricity-generating equipment located at your home, owned and operated by you, the member. The generation may, or may not, be operated in parallel (connected to) Flint Energies. Members inquiring about distributed generation generally fall into four basic categories:

  • Small power production facilities (solar, wind, waste),
  • Backup power which can be synchronized with the utility upon restoration from utility outages,
  • Generation for self-service of customer’s own load through parallel operation with the utility and peak shaving of demand,
  • Generation that is for exporting (landfill gas, large wind farms, etc.).
     


Step 2 – Learn from Flint Energies’ Experience

How Does a Member Apply to Install and Operate DG on the Flint Energies System?


17 Flint Energies members have already installed their Solar PV energy systems. If you would like to install and operate power generation on the Flint Energies system, we recommend you review the following:

  • Review the costs of the equipment including initial costs and annual operation and maintenance costs including cost of insurance. These may be capital costs or costs of a long term lease.
  • Do research on the technologies available and then locate local reputable vendors that sell, install and maintain the DG you choose.
  • Make sure, prior to any purchase, that you have applied with Flint to interconnect your power generation and that you have met all requirements. (See application below)
  • Review the Flint rates and related monthly charges

 

Step 3 – Make a Formal Application to Flint Energies

Getting Started
You can start the process by submitting the appropriate application (and required fee, if necessary) as well as ensuring the technology you choose meets all of the requirements listed in the documents below. It is likely you will have to get the vendor involved in submitting the application to ensure the technology meets all of our requirements. Upon receipt of the application (and fee, if required) and other required documentation, the Flint Energies engineer will review the application for approval. If your application is denied, Flint will provide information as to the requirements for approval. Along with the approval, Flint will provide a cost of further interconnection studies, if necessary, and for the physical interconnection. Once approval is obtained by Flint, the appropriate Interconnection Agreement shall be executed and any integration costs due to Flint shall be paid prior to implementation. Prior to physical interconnection of DG, a Flint Energies representative will inspect for proper operation and installation.

For More Information, contact:

Contact Manager of Engineering,

James Rogers, Flint Energies
900 Highway 96
Warner Robins, GA 31088
Phone:1-478-988-3536
Fax:1-478-988-3559
E-mail: jrogers@flintemc.com

Net Metering & Interconnection (Solar/Wind) Agreement

Get the Facts Before Buying Into Wind Power

 

Image Description

TOGETHERWESAVE.COM

LEARN MORE ABOUT ENERGY SAVINGS